Each story follows the same format: the challenge, what we did, and the result with a number where one exists.
- Modern Matter · US luxury home hardware brand · India supply chain built in 12 months; defects 25-30% → under 2%; logistics cost down 80%.
- Clingmans · US home decor importer · A difficult India operation stabilised mid-Covid.
- ABB · Global energy and engineering group · $4M+ in annualised savings in Indian metal and fabrication.
Typical outcomes; results vary with the starting point.
Want a result like these? Start with the diagnostic.
Free. No obligation. A written summary within two business days.
Book a 30-minute India sourcing diagnostic
You speak with me, not a salesperson.