Summary
Most India sourcing plans are sound on paper. They fail in the gap between the plan and the factory floor: specifications nobody wrote down, samples that production never matches, and corrective actions nobody verifies. This paper maps where the gap opens, the five controls that close it, and how to tell whether you have one today.
The problem, in buyers’ words
“The samples were perfect. Production isn’t.” “We hear about delays after the ship date.” “The supplier says it’s fixed, and then it comes back.” Buyers describe the same few symptoms whatever they make. They are rarely signs of a bad strategy. India was the right call. The gap is in execution: what happens between the purchase order and the container.
Where the gap opens
| Stage | What usually goes missing |
|---|---|
| Quote | No landed cost per good unit; rejects and rescue freight left out |
| Specification | No metric drawings, tolerances or defect definition the factory works to |
| Sample | One perfect piece approved; no first-article sign-off on the production line |
| Production | No in-process checks; no visibility into tier-2 suppliers |
| Shipment | Inspection only at the end, if at all; documents not checked |
| After a problem | Corrective action agreed by email and never verified |
Field note. At Terex, many of our lead-time swings didn’t start at the supplier I was talking to. They started two tiers down, with sub-suppliers nobody on our side could see. The gap is often one level below the one you are watching.
Five controls that close the gap
- Write the standard down. Drawings converted to the factory’s units, with tolerances and a defect definition; a supplier quality guide with photos of good and bad.
- Approve production, not samples. First-article sign-off on parts made on the production line, with the production process.
- Inspect during production. In-line checks catch a problem when it costs one shift, not one container.
- Make the work visible weekly. One report: orders by stage, inspection results, open actions, decisions needed.
- Close only what is verified. Every corrective action has an owner, a date and an on-site check, and stays open until the next inspection confirms it holds.
Field note. At Modern Matter, the factories weren’t careless. Nobody had told them what good looked like. Writing the standard down, with jigs and fixtures built with the suppliers, did more than any amount of end-of-line inspection: defects fell from 25-30% to under 2%.
A weekly report you can copy
| Section | What it shows |
|---|---|
| Orders by stage | Raw material → in process → finishing → packing → shipped |
| Late or at risk | Order, reason, recovery date |
| Inspection results | Lots inspected, pass/hold/fail, defects by type |
| Open corrective actions | Issue, owner, due date, verification |
| Decisions needed | What the buyer must decide this week |
Self-assessment: do you have an execution gap?
Answer yes or no.
- Does every SKU have a drawing in the factory’s units, with tolerances?
- Does each factory have a written definition of a defect?
- Do you approve first articles from the production line?
- Is there an inspection during production, not only at the end?
- Do you know your landed cost per good unit, including rejects?
- Do you get a weekly report you didn’t have to chase?
- Can you name your suppliers’ key sub-suppliers?
- Is every corrective action verified on site before it is closed?
- Would you hear about a delay before the ship date?
- Is one named person accountable for each open issue?
Three or more “no” answers usually means the gap is costing you money.
What to do on Monday
Pick your most painful supplier. Write down its defect definition, ask for its last three inspection records, and list the open corrective actions with an owner and a date. If you can’t, that is your gap. Book a 30-minute diagnostic and we’ll help you find it.
By Ram Raghuraman, Founder, BCube Global Solutions · CPSM · Director, ISM India · Published November 2026
[Download the PDF]
Want this applied to your suppliers? Book the diagnostic.
Free. No obligation. A written summary within two business days.
Book a 30-minute India sourcing diagnostic
You speak with me, not a salesperson.