Label: Programme
BCube helps mid-market companies decide which products to move to India, then qualifies the Indian suppliers and runs the transfer on the ground. We compare landed cost per good unit, not quoted price, approve first articles against your current benchmark, and keep China running until India has proven itself.
Book a 30-minute India sourcing diagnostic
Before BCube · Terex: $8M+ a year on $200M+ of spend, from a best-cost-country programme across India, China and Mexico.
Who this is for
Importers, distributors and OEMs with significant China spend and a tariff exposure that changed in 2025-26, companies starting in India for the first time, and buyers who tried India once, had a bad experience and want to try again properly.
What usually goes wrong
| What you see | What is usually behind it |
|---|---|
| India quotes look cheaper but landed cost isn’t | Freight, duty, inspection and rejects not in the comparison |
| Samples pass, first production fails | No first-article approval against the China benchmark |
| Tooling transfer drags on for months | No owner for tooling ownership, shipment or rebuild |
| China is switched off too early | No gates for when the Indian supplier can carry volume |
Thinking about moving a part family? Send us up to five SKUs and book a diagnostic. Book a diagnostic
How a move works
- Landed cost per good unit. Price, freight, duty, inspection, rejects and inventory carrying cost for the SKUs you name; duty kept as a separate line so it can be re-run when rates change
- Move, move with care or keep. A decision for each part, with the reasons
- Supplier qualification. Three to five audited Indian suppliers per part family, quoted on a common template
- First article and samples. Approval against your China golden sample, with written sign-off
- Tooling. Ownership, shipment or rebuild, and trial runs
- Ramp with a dual-source period. China keeps shipping until India passes its gates
- Weekly tracking. Through the first three production cycles
Which parts move first
| Move first | Move with care | Usually keep in China for now |
|---|---|---|
| Machined, cast, forged and fabricated metal parts; brass and steel hardware; wood and metal decor; leather goods; home textiles; pump and valve bodies | Electrical assemblies, wire harnesses, ceramics, kitchenware that needs food-contact testing, products with complex packaging and assortments | Parts whose supply is concentrated in China, such as some electronic components, magnets and specialised actuators. Plan a dual source instead |
Gates before an Indian supplier carries volume: audit passed · first article approved · pilot lot inspected and accepted · three consecutive on-time lots at agreed quality · corrective actions closed.
Why now: on many goods, US imports from China carry a 25% or 7.5% Section 301 duty plus a 12.5% forced-labour duty above the normal rate, while goods from India carry 10%. In Europe, the EU-India FTA will cut duties on most Indian goods once in force; Australia already imports Indian goods duty-free under ECTA. Last verified 13 November 2026. US · Europe · Australia
Proof
At Terex, Ram ran the business cases for moving steel, fabrications and castings to suppliers in India, China and Mexico. North American steel grades weren’t available in either country, so locally available grades were qualified as approved substitutes, each tested in North American conditions or by an independent lab first. That discipline, testing what you get as well as who makes it, is built into every BCube transfer.
For Modern Matter, BCube built the India supply chain end to end in 12 months: factory network, contracts, quality protocols, logistics and a local team. Read the case
How you get it
Delivered as a fixed-scope programme (typical investment $10,000-35,000, 6-16 weeks), usually after a Sourcing Assessment ($3,000-7,500). Ongoing control continues through an India Desk from $4,500 a month.
We don’t take inspection-only work. See engagements & investment
Related: Should-Costing & Cost Reduction · Supplier Discovery & Audits · Toolkit: Landed-cost calculator · Whitepaper: Moving from China to India
Send us five SKUs and their current price. We’ll show you the China-vs-India landed cost.
Free. No obligation. A written summary within two business days.
Book a 30-minute India sourcing diagnostic
You speak with me, not a salesperson.